Best Project Planning Engineering Course | Reinforce QST Pvt. Ltd.
Project Planning Engineering & Management with Primavera P6
Phases of construction:
- Procurement phase (Bidding and award phase)
- Construction Phase
- Closeout Phase
Major types of construction projects:
- Residential Housing Construction.
- Institutional and Commercial Building Construction.
- Specialized Industrial Construction.
- Infrastructure and Heavy Construction.
Construction projects participants:
- The Owner (Client).
- The Design Professionals.
- The Construction Professionals.
- The Project Manager.
Contract strategy:
- What is a Contract.
- Selection of Contract Type.
- Project Objectives.
- Project Constraints.
- Project Delivery Methods.
- Traditional Approach.
- Direct Labour.
- Design-Build.
- Turnkey.
- Build-Operate-Transfer (BOT).
- Professional Construction Management (PCM).
- Contractual Relationships.
- Types of Contracts.
- Contract Administration.
- Selecting the Contractor.
- Sub-Contracting.
Project planning:
- Introduction.
- Project Planning Steps.
- Work Breakdown Structure (WBS).
- WBS and organizational breakdown structure (OBS).
- WBS coding.
- Project Activities.
- . Activities Relationships.
- Logical relationship considering resource constraints.
- Overlap or lag.
- Types of activities relationships.
- Drawing Project Network.
- Estimating Activity Duration and Direct Cost.
Project scheduling:
- The Critical Path Method.
- Calculations for the Critical Path Method.
- Activity-On-Arrow Networks Calculations.
- Forward path.
- Backward path.
- Float calculations.
- Identifying the Critical Activities.
- Precedence Diagram Method (PDM).
- Time-Scaled Diagrams.
- Schedule Presentation.
- Criticisms to Network Techniques.
Scheduling of linear projects:
- Linear Projects.
- Resource-Driven Scheduling.
- Line of Balance (LOB).
- Basic Representation.
- LOB Calculations.
- Crew synchronization.
- Meeting a deadline duration.
- Calculating resource needs.
- Drawing the LOB Schedule.
Resource management:
- Resource Definition.
- Resource Management.
- Resource scheduling.
- Resource Allocation.
- Resource Aggregation (Loading).
- Resource Levelling (Smoothing).
- Scheduling with Limited Resource.
Tracking work:
- Control Systems.
- Linking the WBS and CPM.
- Coding Systems for Project Reports.
- Control Schedules for Time and Cost.
- Relationships Between Time and Work.
- Earned-Value System.
- Monitoring Project Performance.
- Causes of Cost Vs Schedule Variances.
Project time-cost trade-off:
- Time-Cost Trade-Off.
- Activity Time-Cost Relationship.
- Project Time-Cost Relationship.
- Shortening Project Duration.