Best Project Planning Engineering Course | Reinforce QST Pvt. Ltd.

 

Project Planning Engineering & Management with Primavera P6

Project Planning Engineering Course

Phases of construction:

  • Procurement phase (Bidding and award phase)
  • Construction Phase
  • Closeout Phase

Major types of construction projects:

  • Residential Housing Construction.
  • Institutional and Commercial Building Construction.
  • Specialized Industrial Construction.
  • Infrastructure and Heavy Construction.

Construction projects participants:

  • The Owner (Client).
  • The Design Professionals.
  • The Construction Professionals.
  • The Project Manager.

Contract strategy:

  • What is a Contract.
  • Selection of Contract Type.
  • Project Objectives.
  • Project Constraints.
  • Project Delivery Methods.
  • Traditional Approach.
  • Direct Labour.
  • Design-Build.
  • Turnkey.
  • Build-Operate-Transfer (BOT).
  • Professional Construction Management (PCM).
  • Contractual Relationships.
  • Types of Contracts.
  • Contract Administration.
  • Selecting the Contractor.
  • Sub-Contracting.

Project planning:

  • Introduction.
  • Project Planning Steps.
  • Work Breakdown Structure (WBS).
  • WBS and organizational breakdown structure (OBS).
  • WBS coding.
  • Project Activities.
  • . Activities Relationships.
  • Logical relationship considering resource constraints.
  • Overlap or lag.
  • Types of activities relationships.
  • Drawing Project Network.
  • Estimating Activity Duration and Direct Cost.

Project scheduling:

  • The Critical Path Method.
  • Calculations for the Critical Path Method.
  • Activity-On-Arrow Networks Calculations.
  • Forward path.
  • Backward path.
  • Float calculations.
  • Identifying the Critical Activities.
  • Precedence Diagram Method (PDM).
  • Time-Scaled Diagrams.
  • Schedule Presentation.
  • Criticisms to Network Techniques.

Scheduling of linear projects:

  • Linear Projects.
  • Resource-Driven Scheduling.
  • Line of Balance (LOB).
  • Basic Representation.
  • LOB Calculations.
  • Crew synchronization.
  • Meeting a deadline duration.
  • Calculating resource needs.
  • Drawing the LOB Schedule.

Resource management:

  • Resource Definition.
  • Resource Management.
  • Resource scheduling.
  • Resource Allocation.
  • Resource Aggregation (Loading).
  • Resource Levelling (Smoothing).
  • Scheduling with Limited Resource.

Tracking work:

  • Control Systems.
  • Linking the WBS and CPM.
  • Coding Systems for Project Reports.
  • Control Schedules for Time and Cost.
  • Relationships Between Time and Work.
  • Earned-Value System.
  • Monitoring Project Performance.
  • Causes of Cost Vs Schedule Variances.

Project time-cost trade-off:

  • Time-Cost Trade-Off.
  • Activity Time-Cost Relationship.
  • Project Time-Cost Relationship.
  • Shortening Project Duration.

Comments

Popular posts from this blog

Best Project Planning Engineering Training Institute

Quantity Surveying Course in Mumbai

Quantity surveying course