Best civil engineering courses |institute | 100% live project training
Overview of Civil Engineering Course:
Construction Industry is one of the booming
industries in the world since 1980s. Under the construction industry, there are
so many types of professional and non professional workers are working as
Engineers, Architectures, QuantitySurveyors, Project
Managers, Accountant, Technical Officers, Billing engineers, Supervisors and Labours etc. It is unlikely
that a project can be run successful in construction industry without having
those workers. Among these professionals, Quantity surveying is of paramount importance
to deliver the efficiency of projects along with financial arrangements before
the actual execution of the project. Reinforce quantity surveyors and trainingPvt. Ltd has trained and placed more than 10000 students to fulfil the demands
of construction industry. Reinforce quantity surveyors and training is
providing 100% live project training to civil engineers in India as well as
abroad. We offered professionalcertification courses on Quantity surveying, Billing engineering, Planningengineering with Primavera P6 and MSP. If you are looking for best institute of Quantity surveying course inIndia, we are
happy to welcome you at Reinforce Group to provide training of Road estimation, Bar Bending Schedule, Billing Engineering, RA Bill Making, Planning engineering With Primavera
P6.Project management construction. Tendering and procurement management.
Quantity take off from structural and architectural drawings. Learn all these courses from
industry experts at Reinforce QST which is one the top rated training institute
in India. The fallowing course details
are as fallows.
Quantity surveying Course:
- Introduction to Quantity Surveying and Role of Quantity Surveyors.
- Sequence & schedule of work with all standard Activities.
- Brief study of building structure from foundation to top level of building.
- Procedure of estimating metric system, unit conversion.
- Brief study of construction materials, Nomenclature of items.
- Estimation and costing of concrete work (footing, columns, slab, beams, staircase)
- Estimation and costing of mortar work, plaster work.
- Quantity take off technique from the architectural plan (Brick work, plaster and painting putty work).
- Estimation works of all types of buildings
Billing engineering course:
The following types of bills are
prepared at various stages of work during building constructions
·
Advance bills
·
R.A bills
·
Cash bills
·
Final bills
1.
Advance bills can be
prepared for the following:
- For material contract, the advance bill can be prepared against the material dumped on site by the contractor.
- · The advance bill for the items of work that are expected to be completed within a scheduled period can be forwarded to avoid delay in payments.
- If bills submitted
from site) are not clear or Billing Engineer wants to cross-check the measurements,
quantities and stages of work, then to avoid delay, advance payment against the
bill can be prepared.
- Name of Contractor,
name of site, date, advance note number, previous advance details etc.
- Agreement of
Contract.
- Basic rate for
material supply.
- Conditions in the
contract for percentage of advance against supply of material.
- Quality report of
material from site with quantity, approved brand name, challan number and
specimen samples of the received material.
- Name of the contractor, name of site, date, advance note number, previous advance details etc.
- Documents required
from site to project the work details, approximate costing of the work to be
done, labour strength available at site, overall speed of the work etc.
- Advance bill should be
prepared on the payment Chelan by the site engineer.
- The bills should be
forwarded to accounts department for arithmetical checking after checking by
the Billing Engineer.
- The cheque, if ready, is forwarded to the engineering department for issuing it to the contractor with proper entries.
Project Planning Engineering & Management with Primavera P6
-
Phases of construction:
· Procurement phase (Bidding and award phase)· Construction Phase· Closeout PhaseMajor types of construction projects:
· Residential Housing Construction· Institutional and Commercial Building Construction· Specialized Industrial Construction· Infrastructure and Heavy ConstructionConstruction projects participants:
· The Owner (Client)· The Design Professionals· The Construction Professionals· The Project ManagerContract strategy:
· What is a Contract· Selection of Contract Typeo Project Objectiveso Project Constraints· Project Delivery Methodso Traditional Approacho Direct Labouro Design-Buildo Turnkeyo Build-Operate-Transfer (BOT)o Professional Construction Management (PCM)o Contractual Relationships· Types of Contracts· Contract Administration· Selecting the Contractor· Sub-ContractingProject planning:
· Introduction· Project Planning Stepso Work Breakdown Structure (WBS)o WBS and organizational breakdown structure (OBS)o WBS codingo Project Activitieso Activities Relationshipso Logical relationship considering resource constraintso Overlap or lago Types of activities relationshipso Drawing Project Network· Estimating Activity Duration and Direct CostProject scheduling:
· The Critical Path Method· Calculations for the Critical Path Methodo Activity-On-Arrow Networks Calculationso Forward patho Backward patho Float calculationso Identifying the Critical Activitieso Precedence Diagram Method (PDM)· Time-Scaled Diagrams· Schedule Presentation· Criticisms to Network TechniquesScheduling of linear projects:
· Linear Projects· Resource-Driven Scheduling· Line of Balance (LOB)o Basic Representationo LOB Calculationso Crew synchronizationo Meeting a deadline durationo Calculating resource needso Drawing the LOB ScheduleResource management
· Resource Definition· Resource Management· Resource scheduling· Resource Allocation· Resource Aggregation (Loading)· Resource Levelling (Smoothing)· Scheduling with Limited Resource.
#Billing #Engineering #Billing_engineering #Project_planning #Reinforce #Quantity
#surveyors #Surveying #Civil_engineers #Project_planning_management #Buildings
#Estimation #Estimation_of_roads
#Bridges_and_Tunnel #Quantity_Surveyors
Plot 3A, Ground Floor,
Westend Marg, Saiyad ul Ajaib, Near Saket Metro Station Gate 2, New Delhi
110030
If you're trying to lose pounds then you absolutely have to get on this totally brand new custom keto diet.
ReplyDeleteTo create this service, certified nutritionists, fitness couches, and cooks united to develop keto meal plans that are efficient, convenient, cost-efficient, and satisfying.
Since their first launch in early 2019, 100's of people have already remodeled their body and well-being with the benefits a great keto diet can give.
Speaking of benefits: in this link, you'll discover 8 scientifically-certified ones offered by the keto diet.